DGDBTC MA (7) Turning Upwards

已更新
Keep your eyes peeled to the MA (7) and look for it to head upwards before crossing the MA (25). The double top most definitely has my attention, however the rebound was much better than the last double top. As always, BTCUSD is something that correlates closely to DGDBTC. I'm watching BTCUSD very closely to see if it breaks 11190.

注释
T-20 minutes and counting
-Once the countdown resumes, the orbiter's onboard computers transition to launch configuration
-Start fuel cell thermal conditioning
-Close orbiter cabin vent valves
-Transition backup flight system to launch configuration
注释
T-9 minutes and holding
This is the final built-in hold, and varies in length depending on the mission.
-During the hold, final launch window determination
-Activate flight recorders
-Final "go/no-go" launch polls conducted by NASA Test Director, Mission Management Team and Launch Director
注释
T-9 minutes and counting
-Once the countdown resumes, start automatic ground launch sequencer
-Retract orbiter access arm (T-7 minutes, 30 seconds)
注释
T-5 minutes and counting
-Start auxiliary power units
-Arm solid rocket booster range safety safe and arm devices
-Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
-Retract gaseous oxygen vent arm, or "beanie cap" (T-2 minutes, 50 seconds)[6]
-Crew members close and lock their visors (T-2 minutes, 0 seconds)
-Orbiter transfers from ground to internal power (T-50 seconds)
-Ground launch sequencer is go for auto sequence start (T-31 seconds)
-Activate launch pad sound suppression system (T-16 seconds)
注释
T-10 seconds and counting
-Activate main engine hydrogen burnoff system (T-10 seconds)
-Ground launch sequencer commands main engine start (T-6.6 seconds)
注释
T-0 seconds
-Solid Rocket Boosters ignite
-Explosive bolts release the boosters
-Shuttle stack lifts off from launch pad

Hope you Nasa fans enjoyed this.

Be sure to keep an eye on tradingview.com/chart/h7Hkfdah/ .
DGDBTCTrend Analysis

免责声明